Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The project encompassed the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://maroonbookmarks.com/story20565286/the-penmann-team-delivers-specialist-hvac-installation-for-nutricia-s-liverpool-site-in-line-with-fsi-phase-1-and-2