Be sure that the substrate is perfectly sealed and that all hungry regions are dealt with before proceeding to install the program. If the overcoating period of time with the primer is exceeded, the area need to be lightly abraded and vacuumed right before further coats are applied. We also https://mcgepoxycoatings.com/why-decorative-quartz-screed-works-wonders-for-hospitality-flooring/